Научно-технический журнал

«Onshore and offshore oil and gas well construction»

ISSN 0130-3872

DOWNHOLE PIPE LINES PREVENTING COMPLICATIONS IN OIL PRODUCTION

UDC: 621.512:65:656.1
DOI: 10.33285/0130-3872-2021-8(344)-48-51

Authors:

SHAIDAKOV VLADIMIR VLADIMIROVICH 1,
PENZIN ALEXEY VYACHESLAVOVICH 1,
CHERNOVA KATERINA VLADIMIROVNA 2,
ZALYAEV OLEG ALEXANDROVICH 1

1 Ufa State Oil Technical University, Ufa, Russian Federation
2 Irkutsk National Research Technical University, Irkutsk, Russian Federation

Keywords: complications in oil production, chemical reagent, pump, downhole pipeline, polymer, reinforcement, modeling, destruction

Annotation:

The paper presents the design parameters of capillary systems for a complicated stock of oil wells. The design of downhole pipelines used to supply chemicals as well as materials for their manufacture are analyzed. The features of polymer downhole pipelines of the KR-1 type and their destruction in downhole conditions are described. The advantages of downhole polymer reinforced pipelines and the technology of their application are considered. The conditions for their effective operation and destruction are considered. Based on the results of mathematical modeling and bench, field tests of polymer pipelines, the possibility of up to 10 % radial deformation was established while maintaining the strength parameters.

Bibliography:

1. Шайдаков В.В., Чернова К.В., Пензин А.В. Полимерные армированные трубопроводы в современных гидравлических системах: моногр. - М.: Инфра-Инженерия, 2018. - 228 с.
2. Шайдаков В.В., Чернова К.В., Пензин А.В. Современные химические методы насосного дозирования в нефтедобыче: учеб. пособие. - М.: Инфра-Инженерия, 2018. - 120 с.
3. Bowman C.W. Increasing the Production from Marginal Gas Wells // SPE International Oilfield Corrosion Symposium, Aberdeen, UK. - 2006. - May. - DOI: 10.2523/100514-ms
4. FLOW ASSURANCE: Hydrate inhibitors for deepwater flow assurance. - URL: https://www.offshore-mag.com/pipelines/article/16755698/flow-assurance-hydrate-inhibitors-for-deepwater-flow-assurance
5. Sousa A.L., Matos H.A., Guerreiro L.P. Preventing and removing wax deposition inside vertical wells: a review // J. of Petroleum Exploration and Production Technology. - 2019. - Vol. 9, Issue 3. - P. 2091-2107. - DOI: 10.1007/s13202-019-0609-x
6. Garza T. Asphaltene inhibitor prevents deposition in long-distance tieback. - URL: https://www.offshore-mag.com/pipelines/article/16758332/asphaltene-inhibitor-prevents-deposition-in-longdistance-tieback