Научно-технический журнал

«Onshore and offshore oil and gas well construction»

ISSN 0130-3872

Onshore and offshore oil and gas well construction
"Perfobur" technical system for secondary opening of a productive formation

UDC: 622.23.05
DOI: 10.33285/0130-3872-2022-2(350)-47-52

Authors:

LYAGOV ILYA A.1,
LYAGOV ALEXANDER V.2,
SHAIDAKOV VLADIMIR V.2,
GROGULENKO VLADIMIR V.2,
ZINATULLINA ELMIRA YA.2

1 LLC "Perfobur", Moscow, Russia
2 Ufa State Oil Technical University, Ufa, Russia

Keywords: well, productive formation, umbilical cable, sidetracking, screw downhole motor, inclinometer, orientating device

Annotation:

The article deals with the problems of secondary opening of a productive formation. Information on modern systems of cumulative, slotted hydro-sand-jet perforation and a number of others is presented, their disadvantages are assessed. The emphasis is placed on the technique and technology of a productive formation secondary opening of a well by drilling on aflexible drill string of multi-directional ultra-small channel of 58...71 mmdiameter, up to 15 m long and 5...12 m radius of curvature along the predicted and controlled trajectory. The assembly of "Perfobur" technical system is presented, which includes a ground-based umbilical cable as well as receiving-processing and borehole complexes. The downhole complex includes a drill bit, centralizers, small-sized sectional screw downhole motor, flexible non-magnetic drilling unit, orientating device, inclinometer, hydraulic loader – vibration damper, rigid pusher. The information transmission system consists of an inclinometer above the bit, which transmits information to the mother telesystem through a high-speed wireless electromagnetic channel and then through information fiber-optic channel passing through an umbilical cable to a ground receiving-processing complex. The technology has been successfully applied with the use of traditional tubing and units of various carrying capacities during the secondary opening of more than 70 wells using seven technological fleets.

Bibliography:

1. Bliznyukov V.Yu., Povalikhin A.S. Tekhnologicheskie skhemy bureniya sistem gorizontal'nykh stvolov v plaste vysokovyazkoy nefti // Stroitel'stvo neftyanykh i gazovykh skvazhin na sushe i na more. – 2011. – № 10. – S. 10–15.
2. Lyagov I.A. Obosnovanie i razrabotka tekhnologii vtorichnogo vskrytiya produktivnykh plastov razvetvlennymi skvazhinami sverkhmalogo diametra: avtoref. dis. … kand. tekhn. nauk: 25.00.15. – SPb, 2014. – 20 s.
3. Perforating. Maximum reservoir productivity in new or existing wells / Schlumberger. – URL: http://www.slb.com/services/completions/perforating.aspx
4. Tekhnologiya shchelevoy gidromekhanicheskoy perforatsii kompanii "Nekko". – URL: https://www.nekko.ru/servisi/perforaciya
5. Bleakley W.B. Good well completion // Oil and Gas J. – 1962. – June.
6. Bradley W.B. Bottom-hole assemblies – key to control of deviation // Oil and gas J. – 1975. – Vol. 73, No 29. – P. 60–66.
7. Dickinson W., Anderson R.R., Dickinson R.W. The Ultrashort-Radius Radial System. – SPE Drilling Engineering. – 1989. – Vol. 4, Issue 3. – P. 247–254. – DOI: 10.2118/14804-PA
8. Lyagov I.A. Bottomhole Formation Zone Completion through Ultra Deep Multibranch Channels: Experimental Research of a New Technology // Mine planning and equipment selection: Proc. of the 22nd MPES Conf., Dresden, Germany, Oct. 14–19. – Springer, 2014. – P. 1221–1229. – DOI: 10.1007/978-3-319-02678-7_118
9. Dickinson W., Dickinson R.W. Horizontal Radial Drilling System // SPE California Regional Meeting, March 27–29, Bakersfield, California. – DOI: 10.2118/13949-MS
10. Pickett G.W. Techniques and Deflection Tools in High-Angle Drilling: Past, Present and Future // J. of Petroleum Technology. – 1967. – Vol. 19, no. 4. – P. 469–476. – DOI: 10.2118/ 1597-PA
11. Tekhnologiya kislotnogo vozdeystviya na plast po tekhnologii "Fishbone". – URL: http://www.fishbones.as
12. Tekhnologiya radial'nogo bureniya RadTech International Inc. – URL: http://radialdrilling.com/services-technology/
13. Lyagov A.V., Lyagov I.A., Suleymanov I.N. Antivibratsionnye – stabiliziruyushchie komponovki buril'noy kolonny dlya tekhnicheskoy sistemy "Perfobur" // SOCAR Proceedings. – 2020. – No 4. – S. 24–32. – URL: https://proceedings.socar.az/uploads/pdf/65/024_032_Lyagov.pdf
14. Lyagov A.V., Lyagov I.A. Vybor dopustimykh radiusov krivizny skvazhin sverkhmalogo diametra (kanalov) dlya tekhnicheskoy sistemy "Perfobur" // Ekspozitsiya Neft' Gaz. – 2014. – № 6(38). – S. 47–52.
15. Pat. 2147669 Ros. Federatsiya, MPK E21B 17/00, E21B 7/06. Sposob komponovki niza buril'noy kolonny / I.E. Ishemguzhin, A.V. Lyagov, E.I. Ishemguzhin [i dr.]; patentoobladatel' Ufimskiy gos. neftyanoy tekhn. un-t. – № 98115695/03; zayavl. 10.08.1998; opubl. 20.04.2000, Byul. № 11.
16. Analytical research and experimental tests on the technology for drilling small diameter channels with small radius of curvature / I.A. Lyagov, N.I. Vasilev, M. Reich, M. Mezzetti // Oil Gas European Magazine. – 2014. – Vol. 40, Issue 3. – P. 124–129.
17. Metodologiya rascheta tekhnicheskoy effektivnosti silovykh sektsiy malogabaritnykh vintovykh zaboynykh dvigateley dlya sistemy "Perfobur" / I.A. Lyagov, F.D. Baldenko, A.V. Lyagov [i dr.] // Zap. Gornogo in-ta. – 2019. – T. 240. – S. 694–700. – DOI: 10.31897/pmi.2019.6.694
18. Pat. 2284402 Ros. Federatsii, MPK E21B 7/08. Orientator / N.A. Shamov, E.G. Aseev, A.V. Lyagov [i dr.]. – № 2005100326/03; zayavl. 11.01.2005; opubl. 27.09.2006, Byul. № 27.
19. Zaboynyy dvigatel' so vstroennym izmeritel'nym modulem dlya geonavigatsii / D.A. Abdrakhmanov, A.V. Bel'kov, A.A. Bikineev [i dr.] // Neft'. Gaz. Novatsii. – 2017. – № 2. – S. 71–72.
20. Grogulenko V.V. Metallopolimernye koltyubingovye truby dlya neftyanoy i gazovoy promyshlennosti: monogr. – Palmarium Academic Publishing. – 2015. – 136 s.
21. Shaydakov V.V., GrogulenkoV.V., Mikhaylov P.G. Konstruirovanie metallopolimernykh koltyubingovykh trub dlya neftyanoy i gazovoy promyshlennosti // Ekspozitsiya Neft' Gaz. – 2015. – № 4(43). – S. 68–70.
22. Pat. 2674485 Ros. Federatsiya, MPK E21B 4/02. Malogabaritnyy shpindel' sektsionnogo vintovogo zaboynogo dvigatelya / A.V. Lyagov, I.A. Lyagov, M.A. Kachemaeva [i dr.]; patentoobladatel' OOO "Perfobur". – № 2017141481; zayavl. 29.11.2017; opubl. 11.12.2018, Byul. № 35.
23. Pat. na polez. model' 195139 Ros. Federatsiya, MPK E21B 4/02, E21B 21/00, E21B 7/04. Buril'naya komponovka s malogabaritnym gidravlicheskim zaboynym dvigatelem / A.V. Lyagov, I.A. Lyagov; patentoobladatel' OOO "Perfobur". – № 2019120556; zayavl. 25.12.2017; opubl.15.01.2020, Byul. № 2.