Научно-технический журнал

«Onshore and offshore oil and gas well construction»

ISSN 0130-3872

Onshore and offshore oil and gas well construction
Improvement of the technology of casing strings collar cementing

UDC: 622.245.422
DOI: 10.33285/0130-3872-2022-6(354)-33-36

Authors:

BAKIROV DANIYAR L.1,2,
ANTONOV VASILY V.1,2,
KUZNETSOV VLADIMIR G.2

1 KogalymNIPIneft, Tyumen, Russian Federation
2 Tyumen Industrial University, Tyumen, Russian Federation

Keywords: collar cementing, production casing string, liner, horizontal wells, time reduction, completion technology

Annotation:

The article presents the design and operationalprinciple of the equipment for collar cementing of production casing strings and sidetrack liners. The current state of this technology implementation is described. The equipment allows refusing to restore the flow section of casing strings after collar cementing and thereby reduce the time for a well development.

Bibliography:

1. Sovremennyy opyt zakanchivaniya oblegchennykh konstruktsiy gorizontal'nykh skvazhin / D.L. Bakirov, M.M. Fattakhov, V.A. Burdyga [i dr.] // Geologiya, geofizika i razrabotka neftyanykh i gazovykh mestorozhdeniy. – 2016. – № 11. – S. 48–53.
2. Optimizatsiya konstruktsii i sovershenstvovanie tekhnologii stroitel'stva gorizontal'nykh skvazhin na ob"ektakh PAO "LUKOYL" v Zapadnoy Sibiri / L.S. Bondarenko, D.L. Bakirov, V.N. Kovalev [i dr.] // Rossiyskaya tekhnicheskaya neftegazovaya konferentsiya i vystavka SPE po razvedke i dobyche, Moskva, 15–17 okt. – 2018. – SPE 191496.
3. Sovershenstvovanie tekhnologii stroitel'stva gorizontal'nykh skvazhin / D.L. Bakirov, M.M. Fattakhov, E.V. Babushkin [i dr.] // Neftepromyslovoe delo. – 2020. – № 1(613). – S. 55–59. – DOI: 10.30713/0207-2351-2020-1(613)-55-59