Научно-технический журнал

«Onshore and offshore oil and gas well construction»

ISSN 0130-3872

Onshore and offshore oil and gas well construction
Flow-rate calculation method for short-term well operation

UDC: 621.88
DOI: 10.33285/0130-3872-2023-4(364)-45-48

Authors:

KOSTILEVSKIY VALERIY A.1,
SHAIDAKOV VLADIMIR V.1,
KOROLEVA DIANA A.2

1 Ufa State Oil Technical University, Ufa, Russia
2 Ufa State Aviation Technical University, Ufa, Russia

Keywords: flow-rate, supply, oil, wells, cumulative production

Annotation:

The article presents a simplified method for calculating the flow rate during short-term operation of wells when using electric submersible pumps (ESP), which makes it possible to determine the productivity factor of a well operating in a periodic mode, to calculate the flow and flow-rate of a well in a periodic mode with certain assumptions.

Bibliography:

1. Kuz'michev N.P. Kratkovremennaya ekspluatatsiya skvazhin – effektivnyy sposob ekspluatatsii skvazhin, oslozhnennykh vynosom mekhprimesey // Inzhenernaya praktika. – 2010. – № 2. – S. 107–110.
2. Aptykaev G.A., Suleymanov A.G. Intensifikatsiya dobychi i uvelichenie MRP skvazhin, oborudovannykh UETsN, metodom kratkovremennoy periodicheskoy raboty // Inzhenernaya praktika. – 2011. – № 4. – S. 65–69.
3. Standing M.B. A Pressure-Volume-Temperature Correlation for Mixtures of California Oils and Gases // Drilling and Production Practice. – 1947. – P. 275–287.
4. Vasquez M., Beggs H.D. Correlation for Fluid Physical Property Prediction // SPE Annual Fall Technical Conf. and Exhibition, Oct. 9–12, 1977, Denver, Colorado. – DOI: 10.2118/6719-MS