Научно-технический журнал

«Onshore and offshore oil and gas well construction»

ISSN 0130-3872

Onshore and offshore oil and gas well construction
№ 5(377), May 2024
Back to archive
TECHNIQUE AND TECHNOLOGY OF GEOLOGICAL-PROSPECTING ACTIVITY AND WELLS DRILLING
Analysis of core isolation during its collection. Problems and solutions
Kurbanov Ya.M., Gilmanov Ya.I., Cheremisina N.A.
5-11
Drill bits operation dynamic coefficient as a factor, limiting the area of their application
Trushkin O.B., Popov A.N.
12-15
EQUIPMENT AND TOOLS
On the issue of studying a vibration device to prevent sticking during the construction of oil and gas wells
Khuzina L.B., Shaikhutdinova A.F., Kyazimov E.A.
16-25
WELLS CEMENTING
Flotation methods and calculation of the buoyancy force when running down casing strings
Oganov G.S., Prokhorenko V.V., Vetrov I.R., Oganov A.G.
26-32
Improving the quality of wells casing in the fields of the Timan-Pechora oil and gas province in conditions of hydrogen sulfide aggression and absorption
Kamenskikh S.V., Parmuzina L.V.
33-40
DEVELOPMENT AND OPERATION OF OIL AND GAS FIELDS
Quantum-chemical modeling of the interaction of carbonate and terrigenous reservoirs basic rocks with acids
Zasovskaya M.A., Starinets M.V., Nekuchaev V.O.
41-44
The use of nanocatalysts to increase the efficiency of the development of heavy high-viscosity oils
Gilaev G.G., Amer M., Al-Idrisi M.S., Gilaev R.G.
45-48
Some specific features of segment-by-segment calculation of wells casing strings electrochemical protection
Seredenok V.A., Sharygin V.M., Zorin A.E., Ignatova N.S.
49-54
The deposits development efficiency increase by using multilateral wells at one of the gasoil fields of Timan-Pechorsky oil and gas province
Ladenko A.A.
55-64
MEMORIAL DATES
V.V. Soloviev left our world
65-66