Top.Mail.Ru

Научно-технический журнал

«Onshore and offshore oil and gas well construction»

ISSN 0130-3872

Onshore and offshore oil and gas well construction
Technical-economic drilling rate is a new indicator for a comprehensive assessment of wells construction efficiency

UDC: 622.24.082.2
DOI: -

Authors:

LEONOV EVGENY G.1,
UBUSHAEV UBUSH B.1,
MELNIKOV IGOR V.2,
MOROZOV VLADIMIR A.2,
IONENKO ALEXEY V.3

1 National University of Oil and Gas "Gubkin University", Moscow, Russia
2 NDP "Chepakovskoe", Stavropol, Russia
3 NGS, Moscow, Russia

Keywords: technical-economic indicators of drilling, comprehensive technical-economic assessment, efficiency of a well construction, technical-economic costs, technical-economic drilling speed

Annotation:

The authors of the article provide a comprehensive assessment of wells construction efficiency. The necessity of a comprehensive technical-economic assessment of drilling operations results is caused by the constant demand of oil companies to increase their technical-technological efficiency. A new indicator – technical and economic drilling speed – has been obtained to assess the efficiency of wells construction, assess damage from non-productive time losses (NPTL), select a drilling contractor, etc. A test numerical assessment of efficiency was carried out using the example of well construction at the Chepakovskoye field, in particular, the damage from NPTL under each casing string and the well as a whole.

Bibliography:

1. Prakticheskie raschety v burenii / V.S. Fedorov, V.G. Belikov, F.D. Zenkov [i dr.]. – M.: Nedra, 1966. – 600 s.
2. Sledkov V.V. Kompleksnaya otsenka effektivnosti protsessa stroitel'stva skvazhin i vnedreniya innovatsiy // Proektirovanie i razrabotka neftegazovykh mestorozhdeniy. – 2022. – № 1. – S. 14–18.
3. Rudneva L.N. Organizatsiya i upravlenie deyatel'nost'yu burovogo predpriyatiya v usloviyakh servisnogo obsluzhivaniya: ucheb. posobie. – Tyumen': TyumGNGU, 2010. – 166 s.