Scientific and technical journal

«Equipment and technologies for oil and gas complex»

ISSN 1999-6934

Equipment and technologies for oil and gas complex
Use of control expert systems to monitor the operation of surface-driven screw pumping units

UDC: 622.276.53.054:681.5
DOI: 10.33285/1999-6934-2023-6(138)-5-9

Authors:

DAVYDOV ALEXANDER YU.1,
VELIYEV ELCHIN F.2,
DAVYDOV ILYA A.1

1 Ufa State Petroleum Technological University, Oktyabrsky, Russia
2 Oil Gas Scientific Research Project Institute, SOCAR, Baku, Azerbaijan

Keywords: screw pumping units with surface drive, monitoring of operational parameters, information technologies, software and logic controller, control systems

Annotation:

This article discusses the use of control expert systems for monitoring the operation of surface-driven screw pumping units. Surface-driven screw pumping units (SDSPU) are widely used in various industries, such as oil production, chemical industry and others. They ensure the efficient operation of the viscous fluid extraction system. However, these pumping units are subject to various malfunctions and failures that can lead to downtime and significant financial losses. Therefore, it is important to have a reliable monitoring system that will allow quick detecting and preventing possible breakdowns and failures during pumps operation. Control expert systems are an effective tool for monitoring and diagnosing the operation of screw pumping units. They include a set of analytical methods and algorithms that allow unattended analyzing and interpreting the data received from pumping units. Expert systems are able to detect deviations from specified modes, predict possible breakdowns and failures as well as offer optimal solutions for troubleshooting. As a result, the use of control expert systems to monitor the operation of surface-driven screw pumps increases the reliability and efficiency of equipment operation, reduces the risk of downtime and repair costs. This is especially true in modern industry, where every minute of downtime can be expensive.

Bibliography:

1. Dinamika raboty shtangovoy kolonny pri dobyche nefti ustanovkoy vintovogo nasosa s poverkhnostnym privodom / A.Yu. Davydov, L.M. Zaripova, M.S. Gabdrakhimov, R.R. Ismagilov // Oborudovanie i tekhnologii dlya neftegazovogo kompleksa. – 2013. – № 3. – S. 26–30.
2. Davydov A.Yu., Nikiforov A.A., Gabdrakhimov M.S. Podbor optimal'nykh rezhimov raboty vintovykh nasosnykh ustanovok s poverkhnostnym privodom s pomoshch'yu upravlyayushchikh ekspertnykh sistem // Territoriya Neftegaz. – 2015. – № 10. – S. 76–79.
3. Davydov A.Yu. Monitoring of the operation of surface-driven screw pumping units using expert control systems // J. of Physics: Conf. Ser. – 2019. – Vol. 1333, № 4. – P. 042005. – DOI: 10.1088/1742-6596/1333/4/042005
4. Davydov A.Yu. Utilization of expert systems for screw pump sets with surface drive management // Advances in Engineering Research (AER). – 2018. – Vol. 157. Int. Conf. "Actual Issues of Mechanical Engineering" (AIME 2018). – P. 129–133. – DOI: 10.2991/aime-18.2018.25
5. Davydov A.Yu., Popov M.S. Issledovanie dinamiki raboty vintovykh nasosnykh ustanovok // Innovatsii i perspektivy razvitiya v neftegazovom dele – 2021: sb. tr. Mezhdunar. nauch.-prakt. konf., Oktyabr'skiy, 16–17 apr. 2021 g. – Ufa: UGNTU, 2021. – S. 181–184.
6. Popov M.S., Davydov A.Yu. Vintovaya nasosnaya ustanovka // Materialy 48-y Vseros. nauch.-tekhn. konf. molodykh uchenykh, aspirantov i studentov s mezhdunar. uchastiem, Oktyabr'skiy, 23 apr. 2021 g. – Ufa: UGNTU, 2021. – S. 1237–1239.
7. Davydov A.Yu., Nikiforov A.A., Gabdrakhimov M.S. Upravlenie rezhimami raboty ustanovki vintovogo nasosa s poverkhnostnym privodom // Sovremennye tekhnologii v neftegazovom dele – 2014: sb. tr. Mezhdunar. nauch.-tekhn. konf., Oktyabr'skiy, 14 marta 2014 g.: v 2 t. T. 1 / otv. red. K.T. Tyncherov. – Ufa: Arkaim, 2014. – S. 332–335.
8. Habibullin M.Ya., Sidorkin D.I. Determination of Tubing String Vibration Parameters under Pulsed Injection of Fluids into the Well // SOCAR Proceedings. – 2016. – No. 3. – P. 27–32. – DOI: 10.5510/OGP20160300285
9. Parameters of Damping of Vibrations of Tubing String in the Operation of Bottomhole Pulse Devices / M.Ya. Khabibullin, R.I. Suleimanov, D.I. Sidorkin, I.G. Arslanov // Chemical and Petroleum Engineering. – 2017. – Vol. 53, Issue 5-6. – P. 378–384. – DOI: 10.1007/s10556-017-0350-6
10. The Usage of Principles of System Geological-Technological Forecasting in the Justification of the Recovery Methods / V.V. Mukhametshin, V.Ye. Andreev, G.S. Dubinsky [et al.] // SOCAR Proceedings. – 2016. – No. 3. – P. 46–51. – DOI: 10.5510/OGP20160300288
11. Integral analysis aimed at identification and analytical solution of issues on oil recovery efficiency enhancement / R.N. Bakhtizin, I.G. Fattakhov, R.R. Kadyrov, A.R. Safiullina // Int. J. of Applied Engineering Research. – 2016. – Vol. 11, Issue 3. – P. 1612–1621.
12. Prospects of Application of Multi-Functional Well Killing Fluids in Carbonate Reservoirs / J.V. Zejgman, V.Sh. Mukhametshin, A.R. Khafizov, S.B. Kharina // SOCAR Proceedings. – 2016. – No. 3. – P. 33–39. – DOI: 10.5510/OGP20160300286
13. Mukhametshin V.V. Bottomhole formation zone treatment process modelling with the use geological and geophysical information // IOP Conf. Ser. Earth and Environmental Science. – 2018. – Vol. 194, Issue 2. – P. 022024. – DOI: 10.1088/1755-1315/194/2/022024
14. Development of a Multiphase Down-hole Twin-screw Pump and its Use in Multiphase-operated Transport Networks / J.U. Brandt, J. Lewerenz, D. Müller-Link, M. Reichwage // Oil Gas European Magazine. – 2015. – Vol. 41, Issue 3. – P. 153–156.
15. Hongbo Bi, Mengmeng Wu, Xiulai Zhang. Design of Parameters Optimization System for Screw Pump Well // Int. J. of Simulation: Systems, Science and Technology. – 2016. – Vol. 17, Issue 25. – P. 1.1–1.6. – DOI: 10.5013/IJSSST.a.17.25.01