Scientific and technical journal

«Oilfield engineering»

ISSN 0207-2351

Oilfield engineering
Results of a well shutdown of the AV1-2 facility of the Urevskoe field due to OPEC limitation

UDC: 622.276.346
DOI: 10.33285/0207-2351-2022-12(648)-58-62

Authors:

ROVINSKIY MIKHAIL V.1,
REIMER VLADIMIR V.1,
KHAFIZOV RAMIL R.1

1 LUKOIL-Engineering Limited KogalymNIPIneft Branch Office in Tyumen, Tyumen, Russia

Keywords: development system, hydrodynamic effect, elastic water-pressure mode, well shutdowns, oil flow rate

Annotation:

The periods of wells shutdown are analyzed. It is shown that during the shutdown period, a hydrodynamic effect manifests itself in the wells, which affects the result of the wells subsequent start-up.

Bibliography:

1. Shchelkachev V.N. Osnovy i prilozheniya teorii neustanovivsheysya fil’tratsii: v 2 ch. – M.: Neft’ i gaz, 1995. – 1077 s.

2. D’yachuk I.A., Knyazeva E.V., Kutukov N.S. Analiz vremennoy ostanovki ekspluatatsionnykh skvazhin na zavershayushchey stadii razrabotki i priblizitel’naya otsenka skorosti nakopleniya ostatochnoy nefti. – Kazan’: Georesursy, 2013. – 72 s.

3. O gidrodinamicheskikh posledstviyakh massovoy ostanovki skvazhin v 90-kh godakh XX veka / E.V. Lozin, A.V. Arzhilovskiy, A.N. Chervyakova [i dr.]. – M.: Neft. khoz-vo, 2018. – 62 s.

4. Tekhnologicheskiy proekt razrabotki Ur’evskogo neftyanogo mestorozhdeniya. – Tyumen’: OOO "LUKOIL–Inzhiniring" "KogalymNIPIneft’" v g. Tyumeni (protokol TsKR Rosnedr po UVS № 8186 ot 22.12.2020).