EFFICIENCY OF USING GAS TURBINE PLANTS WITH EXIT GAS HEAT REGENERATION IN GAS MAINS
UDC: 621.438
DOI: -
Authors:
Porshakov Boris P.1
1 Gubkin Russian State University Oil Gas
Keywords: gas turbine plants, regenerator, heat regeneration efficiency
Annotation:
The paper presents the thermodynamical basis for using gas turbine plants with exit gas heat regeneration for pumping gas via gas pipelines. The efficiency of the plants with different degrees of heat regeneration is compared with that of simper plants. The evaluated use of the regenerating plants allowed to replace plate-type regenerators of in GT-750-6 and GTK-10 plants by tube-type regenerators. The payback period of the latter is estimated at 18-24 months of operation.
Bibliography:
1. Белоконь Н.И. Термодинамические процессы газотурбинных двигателей. - М.: Недра. - 1969. - 125 с.
2. Бартош Е.Т. Газотурбовозы и турбопоезда. - М.: Транспорт, 1978. - 310 с.
3. Газотурбинные установки на газопроводах/Б.П. Поршаков, А.А. Апостолов, А.Н. Козаченко, В.И. Никишин. Под ред. Б.П. Поршакова. - М.: Нефть и газ, 2004. - 215 с.
4. Щуровский В.А., Синицын Ю.Н. Оценка экономии топливного газа при реконструкции компрессорных станций/НТС «Проблемы энергосбережения в газовой промышленности». - М.: ИРЦ Газпром. - 1999. - № 1-2.