Scientific and technical journal

«Proceedings of Gubkin University»

ISSN 2073-9028

Proceedings of Gubkin University
JUSTIFICATION OF PRODUCTIVE INTERVAL PENETRATION PATH FOR HORIZONTAL DRILLING

UDC: 622.244.5
DOI: 10.33285/2073-9028-2020-3(300)-29-38

Authors:

Aliev Zagid S.1,
Kotlyarova Elena M.1,
Aliev Nurlan Sh.1

1 Gubkin Russian State University of Oil and Gas (National Research University), Moscow, Russian Federation

Keywords: drilling path, horizontal wellbore, reservoir pressure, multi-object field, interlayer, ascending profile, gas-hydrodynamic connection

Annotation:

This paper discusses practical examples of justifying the horizontal wellbore path of a gas-bearing formation. Various possible paths have been proposed, taking into account the geological characteristics of the field and numerous factors affecting the productivity of horizontal wells, with respect for synchronous decrease in reservoir pressure in the productive layers.

Bibliography:

1. Алиев З.С., Арутюнова К.А. Определение необходимой длины горизонтальной газовой скважины в процессе разработки. — М.: Газовая промышленность. — 2005. — № 12. — С. 45-47.
2. Алиев З.С. и др. Теоретические и технологические основы применения горизонтальных скважин для освоения газовых и газоконденсатных месторождений. — М.: Недра, 2014. — 450 с.
3. Алиев З.С., Шеремет В.В. Определение производительности горизонтальных скважин, вскрывших газовые и газонефтяные пласты. — М.: Недра, 1995. — 131 с.