Determination of the optimal direction of a horizontal shaft drilling trajectory according to the vector of the primary horizontal stress to increase the efficiency of a formation hydraulic fracturing

UDC: 622.276.66:622.24
DOI: 10.33285/1999-6934-2022-6(132)-40-48

Authors:

BAYKOVSKY DENIS I.1

1 State Production Association "Belorusneft", Gomel, Belarus

Keywords: horizontal shaft, unconventional reservoir, on-ground micro-seismic monitoring, hydraulic fracturing of a formation, maximum horizontal stress, minimum horizontal stress

Annotation:

The article presents and analyzes the results of reports on ground-based micro-seismic monitoring (MSM) of hydraulic fracturing of a formation (HFF) at a number of wells in the Rechitskoye field in the conditions of unconventional reservoirs of I–III oil packs. The performance indicators of horizontal wells of the Rechitskoye field, drilled for I–III packs and being in operation, were analyzed. Regularities are revealed that affect the direction of fracture development during hydraulic fracturing, and as a result, wells performance. As part of the research, the data on the fractures prevailing orientation were studied during hydraulic fracturing at the Rechitskoye field in the conditions of unconventional reservoirs of I–III oil packs. Based on these data, the direction of maximum and minimum horizontal stress is determined. The results obtained served the basis, for identifying a preferred direction for drilling horizontal wells to improve the hydraulic fracturing efficiency of in order to increase the drainage zone in the reservoir and the oil production rate.

Bibliography:

1. Zoback M.D. Reservoir Geomechanics. – UK, Cambridge: Cambridge University Press, 2007. – 464 p.
2. Demyanenko N.A., Povzhik P.P., Tkachev D.V. Tekhnologii intensifikatsii dobychi nefti. Perspektivy i napravleniya razvitiya. – Gomel': GGTU im. P.O. Sukhogo, 2021. – 288 s.
3. Sosnok A.A. Rekordnyy razryv // Neftyanik. – 2022. – 28 apr. (№ 16(2785)). – S. 1.
4. Sosnok A.A. Troynoy rekord // Neftyanik. – 2022. – 9 iyunya (№ 21(2790)). – S. 2.
5. Otchet po obrabotke i interpretatsii dannykh mikroseysmicheskogo monitoringa mnogostadiynogo gidrorazryva plasta (GRP) v gorizontal'noy skvazhine № 292g Rechitskaya, poluchennykh nazemnoy seysmicheskoy gruppoy, dlya kontrolya prostiraniya i razmerov treshchinnoy zony gidrorazryva plasta / OOO "Geoseys". – Dogovor № 23/15 ot 29.09.2015. – 77 s.
6. Otchet po obrabotke i interpretatsii polevykh dannykh nazemnogo mikroseysmicheskogo monitoringa gidrorazryva plasta (GRP) v skvazhine № 310 Rechitskogo mestorozhdeniya RUP "PO "Belorusneft'" / ZAO "Gradient". – Dogovor № 1 ot 25.01.2019. – 223 s.
7. Otchet po obrabotke i interpretatsii polevykh dannykh nazemnogo mikroseysmicheskogo monitoringa gidrorazryva plasta (GRP) v skvazhine № 411 Rechitskogo mestorozhdeniya RUP "PO "Belorusneft'" / ZAO "Gradient". – Dogovor № 3 ot 08.08.2019. – 215 s.
8. Otchet po nazemnomu mikroseysmicheskomu monitoringu gidrorazryva plasta (GRP) v skvazhine № 177 Rechitskogo mestorozhdeniya RUP "PO "Belorusneft'" / ZAO "Gradient". – Dogovor № 2 ot 27.07.2018. – 128 s.
9. Otchet po nazemnomu mikroseysmicheskomu monitoringu gidrorazryva plasta (GRP) v skvazhine № 402 Rechitskogo mestorozhdeniya RUP "PO "Belorusneft'" / ZAO "Gradient". – Dogovor № 2 ot 27.07.2018. – 119 s.
10. Otchet po nazemnomu mikroseysmicheskomu monitoringu gidrorazryva plasta (GRP) v skvazhine № 335 Rechitskogo mestorozhdeniya RUP "PO "Belorusneft'" / ZAO "Gradient". – Dogovor № 1 ot 19.06.2018. – 150 s.
11. Otchet po obrabotke i interpretatsii polevykh dannykh nazemnogo mikroseysmicheskogo monitoringa gidrorazryva plasta (GRP) v skvazhine № 340 Rechitskogo mestorozhdeniya RUP "PO "Belorusneft'" / ZAO "Gradient". – Dogovor № 3 ot 08.08.2019. – 119 s.
12. Otchet po obrabotke i interpretatsii polevykh dannykh nazemnogo mikroseysmicheskogo monitoringa gidrorazryva plasta (GRP) v skvazhine № 327 Rechitskogo mestorozhdeniya RUP "PO "Belorusneft'" / ZAO "Gradient". – Dogovor № 09147 ot 24.10.2018. – 157 s.
13. Hubbert M.K., Willis D.G. Mechanics of hydraulic fracturing // Petroleum Transactions. – 1957. – Vol. 210, Issue 01. – P. 153–168. – DOI: 10.2118/686-G
14. Warren W.E., Smith C.W. In situ stress estimates from hydraulic fracturing and direct observation of crack orientation // J. of Geophysical Research. – 1985. – Vol. 90, Issue B8. – P. 6829–6839. – DOI: 10.1029/JB090IB08P06829